Last additions - House Construction |

Finished SandstoneThe small sandstone tiles mixed in the the 30 cm square tiles for effect.dozerSep 27, 2011
|
|

Completed WallThe completed wall with large sandstone engraving and small sandstone feature tiles.dozerSep 27, 2011
|
|

The other Wall dozerSep 27, 2011
|
|

Finish at Wood TrimThe tiler did a nice job finishing off the upper tile row next to the wood trim.dozerSep 27, 2011
|
|

Finish at adjacent WallThe corner was just painted to blend from the untiled wall to the tiled wall.dozerSep 27, 2011
|
|

Nearing CompletionThe engraving in place and most of the tiling complete. Notice the randomly placed square sandstone tiles and the finish where the tiles meet the wood trim. dozerSep 27, 2011
|
|

Partially Finished WallThe wall with the engraving in place and the lower portion of the sandstone tiling complete.dozerSep 27, 2011
|
|

Lifting Mural into PlaceLifting the engraving into place. dozerSep 27, 2011
|
|

Prep Back of MuralThe adhesive is applied to the back of the engraving. dozerSep 27, 2011
|
|

Weber Tile AdhesiveThe weber tile adhesive is applied to prep the surface for the engraving.dozerSep 27, 2011
|
|

Lower Section TiledPreparing for placing the mural, the lower section has been tiled and next the sandstone engraving will be lifted into place.dozerSep 27, 2011
|
|

Engraving FrameThe prepared frame for where the 75 kg. engraving will be placed.dozerSep 27, 2011
|
|