Last additions - House Construction |
Ground BeamAfter a completed pour with the metal frames distributed evenly at 2.5 meter intervals.
dozerSep 27, 2011
|
|
Staggered Ground BeamA staggered ground beam design to accommodate for unevenness in the ground level.
dozerSep 27, 2011
|
|
Video WalkthroughA quick video walk though of the project a while after completion. dozerSep 27, 2011
|
|
Side Walkway and GardenThe 2m wide side walkway and garden area with 3 small tower type garden lights.dozerSep 27, 2011
|
|
StudySmall sandstone tiles are used on the wall area of the study.dozerSep 27, 2011
|
|
Storage Unit InsideAnother view of the storage/utility room with metal racks currently used for storage. dozerSep 27, 2011
|
|
Ladder and AccessThe service entry access is on the ceiling with the wall mounted ladder providing access. The glass blocks are the oversized 30 cm x 30 cm variety. dozerSep 27, 2011
|
|
Secured StorageThe security partition to make a secured storage area. The partition is made of 1 by 1 lengths of metal welded into a mesh pattern.dozerSep 27, 2011
|
|
Secured StorageA utility/secured storage room with a bunk bed in it. The roll up doors in this unit are split with a small and large section. dozerSep 27, 2011
|
|
Bathroom #2There is a small granite sink unit in each bathroom. The sink is an under mount type.dozerSep 27, 2011
|
|
Bathroom #2Shower enclosure the same as in bathroom number 1. dozerSep 27, 2011
|
|
BedroomThe other side of the bedroom with the bathroom off to the right. The ceilings are stepped/trimmed in this room.dozerSep 27, 2011
|
|