Column within the Load Bearing WallPouring a support column within the cinderblock. A support column within the load bearing walls is a concrete column surrounding vertical rebar.
dozerSep 27, 2011
IMG_3525.JPG
Vertical Rebar for Load Bearing WallsNotice the vertical rebar is secured in place appx. each 40 centimeters to coincide with the holes in the large cinderblocks that will be used for the load bearing walls.
dozerSep 27, 2011
IMG_3542.JPG
CPAC Pour of Ground BeamsCPAC ready mix cement pour of ground beams. 280 KSC (kilometers per square centimeter) concrete was used as in the floor. CPAC is better than hand mix for large areas since it is poured as a homogeneous unit.
dozerSep 27, 2011
IMG_3546.JPG
Concrete VibrationConcrete vibrated as it is poured into the ground beam. Vibrators are necessary to ensure that the concrete doesn't have voids and settles evenly though out the form.
1 commentsdozerSep 27, 2011
IMG_3573.JPG
CPAC Quality ControlCPAC Quality Control staff take a sample of poured cement for a compressive strength test. They will let it dry for 2 weeks and then remove the concrete sample from the form. It is taken to a testing center where the stated KSC (Kilograms per Square Centimeter) compressive strength specification of the concrete is tested. A report will be generated.
dozerSep 27, 2011
IMG_3628.JPG
Floor pour set-upThe prep for the pour of the floor. Note the spacers and wood that will be used to indicate floor depth. The plastic under the rebar frame is the damp course which will seal the floor and ground beam and protect them from ground moisture.
dozerSep 27, 2011
IMG_3633.JPG
Rebar Floor MeshingThis is a scale shot which shows the 6mm rebar meshing used in the floor pour. Additionally, note the spacer and the piece of rebar that extrudes from the ground beam, which is used to secure the floor mesh in place.
dozerSep 27, 2011
IMG_3653.JPG
Different Size Crushed StoneNotice the two different sizes of crushed stone aggregate that will be used. The smaller one on the left is used for concrete which will be poured into the large cinderblock holes.
dozerSep 27, 2011
IMG_3682.JPG
Damp CourseThe damp course is a thin plastic sheet which prevents water penetrating concrete on top of it. This is the look of sub flooring ready for the ready mix concrete floor to be poured. Note the bent pieces of rebar which come out of the ground beam and tie in the rebar to a fixed surface. Also note the depth indicators and spacers.
dozerSep 27, 2011
IMG_3717.JPG
Ready Mix Pour of the FloorNote the consistency of the concrete. It should have just enough moisture to be able to work it and not be watery.
dozerSep 27, 2011
IMG_3353.JPG
Footing HoleA footing hole with metal frame work. Each hole was 1 meter square by about 40 cm. deep. In this design there are only two foundation columns in the patio. Throughout the rest of the house there are footing and then a ground beam on top of the footings. The walls are load bearing with columns inside the wall material itself.
dozerSep 27, 2011
IMG_3361.JPG
Frame SpacerThe use of a spacer with metal tie to keep the metal frame off the surface. The spacer is used to keep the rebar metal frame in the middle of the anticipated concrete pour.
dozerSep 27, 2011
943 files on 79 page(s) 37

Debug Info 
Debug Output: show / hide