IMG_3659.JPG
Electric RoutingSecuring the electric into place prior to the pouring of the concrete floor.
dozerSep 27, 2011
IMG_3660.JPG
Conduit PathThe electrical conduit will run in the floor and also vertically in designated hollow cinder blocks.
dozerSep 27, 2011
IMG_3775.JPG
ConduitThe electrical conduit will run within a designated empty hole within the cinderblock.
dozerSep 27, 2011
IMG_3793.JPG
Power Point OpeningAn opening for a 4 receptacle power point in a designated empty hole within the load bearing wall.
dozerSep 27, 2011
IMG_3805.JPG
Conduit SystemThe conduit screw affixes snuggly into the receptacle box.
dozerSep 27, 2011
IMG_3810.JPG
Power Point BoxThe power point box secured in place with cement.
dozerSep 27, 2011
IMG_3817.JPG
Power points with 4 grounded receptacles will be used throughout the house.
dozerSep 27, 2011
IMG_3840.JPG
External Switch PanelThe black box is for a external (outside) switch panel. The switch panels on the outside are at a height of appx. 1.2 meters.
dozerSep 27, 2011
IMG_3843.JPG
External Power Point + Switch BoxThis shows holes where an external power point and switch box will be located.
dozerSep 27, 2011
IMG_9378.jpg
Leveling Brick EnclosureLeveling the brick enclosure at the front right of the garden area. The enclosure protects the deep water well casing and pvc piping. There is a submerged pump at the bottom of the six inch borehole, which is secured via heavy duty electric wire + a rope safety. dozerSep 27, 2011
IMG_4683.jpg
Initial Formwork for the Lid PourThis shows the initial formwork for the lid pour. The plywood is supported by 2" x 3" form work below. After the pour the form work will be removed.dozerSep 27, 2011
IMG_4700.jpg
Rebar Re Enforcement of LidThis shows the framework to support the top of the tank. The rebar used is 6 mm and is spaced about at 10 cm squares. The blue PVC is where the water will enter the tank from the deep artesian pump, the yellow is the electric which will be routed to the electronic valve for the tank and the artesian pump.dozerSep 27, 2011