IMG_0030.jpg
Bathrom Tiered CeilingNotice the vent windows and the upper exhaust vent in the top of the ceiling. The ceiling is tiered, with recessed lighting. dozerSep 27, 2011
IMG_0037.jpg
Shower StallThe faucets + rain shower head are VRH non stainless with the non glossy look. dozerSep 27, 2011
IMG_4875.jpg
Attic ViewNote that the electric is in conduit that throughout the project. Also there is a view of one of the exhaust fans.dozerSep 27, 2011
IMG_4891.jpg
Front Driveway PourThe front driveway pour. dozerSep 27, 2011
IMG_4916.jpg
A/C InstallationThe A/C unit during installation. Note the electrics are not surface mounted (the are in the wall as with other fixtures) and on the outside the main compressor is wall mounted so as not to take up any ground space and minimize the connection distance. This is a 13000 BTU unit which can cool the master bedroom + great room.dozerSep 27, 2011
IMG_4919.jpg
Patio Terrazzo TilesThe exterior tiles are leveled so that the water drains outward. They are applied in a diamond pattern with a border similar to the bathroom and kitchen. dozerSep 27, 2011
IMG_4867.jpg
Water Tank LidThe water tank lid was poured concrete around a rebar frame. dozerSep 27, 2011
IMG_4868.jpg
Skim Coat ApplicationApplying the skim coat to the archways. The product used for the skim coat is called 'Nature White' which is a white portland cement skim coat product which mixes up using a drill mounted agitator. The product is mixed with natural die pigment to achieve coloration. It can be applied over a smooth surface in a thin layer. dozerSep 27, 2011
IMG_4870.jpg
Bathroom nearing completionNote the raised elevation water heater and the decorative glass blocks. The water heater was selected because it is more durable than the adjustable water warmer types, it is a Seimens brand. The warm/cold water is mixed at the faucet. dozerSep 27, 2011
IMG_4752.jpg
Aluminum Door InstallationThe doors are installed in the pre measured opening. If there is any modification needed to the opening it is done by the aluminum window installers. dozerSep 27, 2011
IMG_4779.jpg
Perimeter Wall OpeningsThe perimeter wall decorative openings as per the plan. These have light fixtures int he top of the opening for a nice touch in the evenings.dozerSep 27, 2011
IMG_4782.jpg
Silicone SealantThe silicone sealant is applied to the terrazzo tiles and the skim coat on the counter. Several coats are applied to prevent moisture problems. dozerSep 27, 2011