The frame work for the roof structure is box section 4 inch x 2 inch heavy 3.2 mm thick metal sections. There are columns at even intervals so a more extensive truss system is unnecessary (as opposed to Chok Dee #1).dozerSep 27, 2011
IMG_8847.jpg
Hip Roof StructureThe raw hip roof structure. The key members are the 3.2 mm thick steel with intermediate sections done in the 2.0 mm thick steel. Box sections are used throughout, no C sections. dozerSep 27, 2011
IMG_8875.jpg
Raw WeldA raw (prior to rust painting) weld. The 3.2 mm thick electrode rods are used (as opposed to the 2.6 mm variety) for a heavy duty weld. All welds should be inspected when ever possible. dozerSep 27, 2011
IMG_8908.jpg
Basic Roof StructureThe basic roof structure with the battens fixed at periodic intervals to support the Cpac roof tiles. dozerSep 27, 2011
IMG_8924.jpg
Rust Painted WeldAfter a few days of raw welds any good team will automatically paint the welds. Just a point of procedure to verify. dozerSep 27, 2011
IMG_8934.jpg
Galvanized Sheeting for Roof ValleyMost of the problems with CPAC concrete roof tiles come from inadequate valley material or poorly done ridges. It is easy to get the wrong stuff, just go to any supply store and ask for the valley material that everyone uses. This is the 1 meter wide material, formed in the center for water run-off, roofs with this as valley material (properly installed) don't have problems. dozerSep 27, 2011
IMG_8966.jpg
CPAC Monier Roof TilesThe CPAC Monier roof tiles being laid in place. These tiles are basically dummy proof, except at the valley and ridges. dozerSep 27, 2011
IMG_8986.jpg
Properly Installed Bird StopThis bird stop has about the right clearance, a snug fit is required or otherwise you will get unwanted entry points. dozerSep 27, 2011
IMG_9177.jpg
Ridges Laid in PlaceThe ridge tiles are laid in place over a waterproofed (via Sika) concrete mix. Note that the exposed concrete will still need to be treated with a exterior coat of waterproofing agent. The other method is dry tech, which is not used here. dozerSep 27, 2011
090403CpacCerta.jpg
CPAC Compressive Strength CertificationA portion of the certification that the samples were tested and the corresponding results. The status field indicates 'p'ass or 'f'ail and the stress column indicates the amount of stress the samples withstood. In this case the 280 ksc samples withstood a minimum of 340 ksc prior to failure. dozerSep 27, 2011
DSC03411.jpg
Poured FootingThe poured footing. The footings are poured and then the ground beam is tied into place around the footing structure. dozerSep 27, 2011
IMG_9066.jpg
External RenderThe aerated blocks again use a specific product for the external render. It is a ready mix cement skim coat type product. It is easy to work and makes for a smooth and nice render finish. The final thickness of the walls will be 12.5 centimeters so this is being applied about 2.5 centimeters on each side. dozerSep 27, 2011