Last additions - House Construction |
Septic Service OpeningThis shows the type of opening used for the 3 septic collections within the system. It is a threaded 6 inch brass lid fitted into a heavy PVC shell. This will be placed on top of the 4.5 inch hole in the lid of the concrete rings. dozerSep 27, 2011
|
|
Septics Prior to Walkway PourThis shows the septics prior to the walkway being poured. dozerSep 27, 2011
|
|
Wood to Support the Facia BoardWood is installed within the box sections of the roof structure to support the facia board which will be affixed. These members still to be painted after the box sections were cut. dozerSep 27, 2011
|
|
Underside of Ridge BeamThe underside of a ridge beam showing the welds and also the underside of the CPAC tiles sitting on the battens. dozerSep 27, 2011
|
|
Ceiling StructureThe C Lie suspension rails used are the heavier grade and are spaced at about 60 centimeters by 1 meter intervals. Note the tiered ceiling section on the left side (to support the two levels of ceiling structure).dozerSep 27, 2011
|
|
External Soffit SupportsThe c lie suspension rails are used to support the heavy nature board (Shera brand) soffit.dozerSep 27, 2011
|
|
More soffit structure + faciaShows the soffit structure including the cross sections and also the facia boards. dozerSep 27, 2011
|
|
Drywall Gypsum BoardThe sheets are screwed into the c lie suspension rails. dozerSep 27, 2011
|
|
SoffitThe soffit material is screwed into the suspension rails in 60 centimeter sections. Note that this nature board (Shera brand) and other soffit material is much more whether resistant than gypsum wallboard (even the moisture resistant kind). Most comparable houses use gypsum for the soffit material which isn't advisable. dozerSep 27, 2011
|
|
Plastered and Taped ceilingTape is applied to the joints and plastered into place. The screws are counter sunk and then plastered, as standard during ceiling installation. dozerSep 27, 2011
|
|
Roof InspectionDon't fool yourself into thinking CPAC roof tiles are totally dummy proof. Leaks often occur at the ridge lines and valleys. A inspection during a rain cycle ensures compliance. This roof had no leaks, hurray!dozerSep 27, 2011
|
|
Lanko K10 waterproofingAny roof not dry teched will need a waterproofing treatment at the ridges even after any visible imperfections are caulked. This house used this product over every section of ridge joint. dozerSep 27, 2011
|
|