happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction

Last additions - House Construction
IMG_9597.jpg
Lanko K11 WaterproofingThe cement skim coat which is evenly applied to the inside of the water tank as a double check against leakage. Note that the Sika water proofing which is mixed into the cement should be sufficient. dozerSep 27, 2011
IMG_9629.jpg
Sloped Bathroom FloorsThe bathroom floors are sloped to allow water run off towards the drain pipe (shown on the left of the solids drain pipe). dozerSep 27, 2011
IMG_9681.jpg
Water HeaterThis is the Siebel water heater as installed in the shower enclosure. The electric is fitted within the wall to feed to unit. Inbound water pipe is shown with an safety on/off valve at the junction with the wall. dozerSep 27, 2011
IMG_9713.jpg
Service Opening Water TankThe finished and plumbed water tank with the automatic pump on top. dozerSep 27, 2011
IMG_9728.jpg
Tank ServiceThe inside of the tank being cleaned of any debris.dozerSep 27, 2011
IMG_9769.jpg
Proper Leveling of ToiletThe toilet being check for level during installation.dozerSep 27, 2011
IMG_9062.jpg
Septics after PourThe service openings are placed to be level with the walkway. dozerSep 27, 2011
IMG_9129.jpg
Rebar Framing for Water TankThe rebar framing is composed of 9mm SD30 strips wired together. The frame structure sits on 6 small footings. dozerSep 27, 2011
IMG_9131.jpg
Framework for Water TankAnother view of the frame work lattice which sits on top of 6 small footings. The framework is centered to be within the external wall using red bricks a spacers.dozerSep 27, 2011
IMG_9132.jpg
Sika Water ProoferSika 'gan sum' waterproofing agent is added to the concrete mix.dozerSep 27, 2011
IMG_9171.jpg
Framed and Poured External WallsAfter the floor pour is completed, the framework as seen is installed and the external walls are poured to a thickness of 15 centimeters. dozerSep 27, 2011
IMG_9185.jpg
Simple SepticAnother view of a simple septic system with the waste pipe entering the concrete rings a a sufficient angle to allow flow. All of the septics are vented with the exhaust about the perimeter wall. dozerSep 27, 2011
943 files on 79 page(s) 13

Debug Info 
Debug Output: show / hide