happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction

Last additions - House Construction
IMG_8944.jpg
Electric WireAll electrics in the house are grounded. The copper ground rod is 1.6m and is earthed near the pump station. The red positive, white is negative and green is the ground. Wire is used in various diameters as appropriate, eg. 1.5, 2.5 and 16 (main). dozerSep 27, 2011
IMG_8945.jpg
Electric line being run to PumpThis line will be routed to the pump station on the exterior of the house. For electric which is run through the garden area a protective concrete casing will be poured over the conduit.dozerSep 27, 2011
IMG_8994.jpg
Position of Control BoxThis shows the position where the control box will go at the front right hand corner of the house. The house will have six zones all rigged with the appropriate size breakers.dozerSep 27, 2011
IMG_9002.jpg
Junction boxJunction box positioned in the wall.dozerSep 27, 2011
IMG_9003.jpg
Electric Line in WallAfter the electric conduit is run up through the wall it is cemented over for a seamless finish render coat.dozerSep 27, 2011
IMG_9028.jpg
Front Junction box areaThis shows the inside + outside junction boxes at the front of the house.dozerSep 27, 2011
IMG_9049.jpg
Junction BoxClose up of junction box showing conduit (which is routed in the wall) securely affixed. dozerSep 27, 2011
IMG_9051.jpg
Control UnitThe control unit for the breakers will be installed here. There are 6 zones attached to individual breakers. The breaker size depends on the load for that zone. Electrics are bticino matix. dozerSep 27, 2011
IMG_9052.jpg
Upper Switch box + Lower Receptacle boxThe switch boxes + power points are secured fastened within the wall at the designated points. dozerSep 27, 2011
IMG_9097.jpg
Junction BoxThe view of an electrical junction box in the attic. Note that the electrics are securely fastened with plastic affixers which ensures full protection of the electric wires.dozerSep 27, 2011
IMG_9369.jpg
PVC Pipe Joined to Tested SectionThe pipe is being run from the automatic water pump to the previously tested in house section (note the cap on the pipe). Any exposed pipe section will be protected within a concrete pour. dozerSep 27, 2011
IMG_9409.jpg
Finished Submerged Water TankThe finished tank, note the inbound water pipe (top), the outbound water pipe (center) and the electric inbound yellow conduit which feeds the solenoid valve within the tank. dozerSep 27, 2011
943 files on 79 page(s) 12

Debug Info 
Debug Output: show / hide