IMG_9708.jpg
Heavy Duty Electronic Valve Solenoid ControlMost often you will find water tanks rigged with a toilet float type of on off valve. These cause the pump (in this case a heavy duty submerged franklin) to turn on an off frequently. This wastes electricity and keeps the water 'churning' all the time never giving any impurities time to settle to the bottom. With this type of electronic valve the desired off/on point can be adjusted by moving the middle yellow adjustment tube.dozerSep 27, 2011
IMG_9712.jpg
Inside of Pump Station Control BoxThis shows the two circuit breakers (for both pumps) and the control unit (on the left) for the submerged Franklin pump.dozerSep 27, 2011
IMG_9104.jpg
ConduitThe yellow PVC conduit is run as needed in the attic above the ceiling to route electric wire to the associated electric appliance (such as fans, lighting, etc.). dozerSep 27, 2011
IMG_9107.jpg
Inbound Electric Line tie inThis shows where the inbound electric main line will enter the house, at the roof line above the patio.dozerSep 27, 2011
IMG_9234.jpg
Inside view of Junction BoxOnly secure wire fasteners are used in a totally electric tape free installation. This means less to wear out and go wrong over time.dozerSep 27, 2011
IMG_9235.jpg
Closed Junction BoxThe sealed junction boxes are indeed secure and neat environment for electric wire connections.dozerSep 27, 2011
IMG_9245.jpg
Routing Electric Wire to the Perimeter WallElectrics are routed to the perimeter wall for above wall lighting and the exterior mounted door bell. This particular run of electric will be contained in the drive way pour.dozerSep 27, 2011
IMG_9246.jpg
Electric routing to the Pumping StationHere the electric is routed around the exterior of the underground water tank. It will service the submerged artesian Franklin pump, the automatic pressure pump and the electronic solenoid (which controls the water level in the tank).dozerSep 27, 2011
IMG_9408.jpg
Weather Proof Control BoxThis box will contain the breakers for the automatic pump, the deep water pump and the control box for the deep water pump.dozerSep 27, 2011
IMG_9423.jpg
Installing the Main Electric PanelThe main electric panel contains associated breakers running from 10 w up to 32 w depending on the load of devices on the particular station. There are 6 stations in the house. All electric equipment is Bticino Matix.dozerSep 27, 2011
IMG_9452.jpg
Typical Power Point InstallationThis shows a power point with a inbound cable co ax TV junction. There is also a telephone jack. Each power point and switch box is temporarily covered with this plastic to prevent splatter during painting and other construction activities. dozerSep 27, 2011
IMG_9456.jpg
Plastic Wrap for Electric Outlet Cover PlateMost don't seem to realize the amount of dust, paint and other construction debris which is airborne during a construction project, most of all the workers. All electric outlet cover plates + switch box plates should be plastic wrapped to prevent ugly hard to clean splatter. dozerSep 27, 2011