IMG_9349.jpg
Die PigmentThe premixed natural die pigment is added to the concrete render mixture. The amount of sand aggregate and cement must not vary to ensure consistency in the resultant coloration. dozerSep 27, 2011
IMG_9360.jpg
Applying the Color Render CoatThe color render coat is applied much the same as a normal render coat. In preparation however a previous coat was applied in a rough state and allowed to set for a week, which prevents the underlying block shape from bleeding through. dozerSep 27, 2011
IMG_9371.jpg
Gate RailThe rail for the gate is laid in place The rail must run level and equidistant from the wall to ensure easy opening and closing of the gate. The rail will be concreted into place. It is strip of 1.5 inch angle steel with a 12 mm round steel rod welded on top. Two sets of two large 4 inch wheels (total of 4) with an indentation will be affixed to the lower edge of the gate, the wheels are grooved to run along the rod. dozerSep 27, 2011
IMG_9284.jpg
Front Brick ColumnsThe front brick columns sit on either side of the drive way. The columns contain the electric conduit which is run up to the top to support the exterior wall lighting. The inside of the columns is filled with concrete.dozerSep 27, 2011
IMG_9283.jpg
Driveway PourIn preparation for the driveway pour the surface is leveled for the correct sloping angle and then the frame mesh is put in place at intervals of 20 centimeters. The red bricks are used as spacers. The pour will be 10 centimeters in depth. dozerSep 27, 2011
IMG_9290.jpg
Driveway Pour in ProcessHand mix was used on the driveway. Red bricks are used as a starting spacer to ensure that the rebar mesh doesn't sit on the ground, further adjustment is done by the 'pull into place method' as the pour progresses. The meshing is pulled to be centered within the 10 centimeter pour.dozerSep 27, 2011
IMG_9707.jpg
Water Flow TestThe walkway is designed to slope out. Then the external gutter area will route water down to the street. dozerSep 27, 2011
IMG_9720.jpg
Water Flow Test and Drainage PVCThe drainage PVC has been installed in the proper places to allow the water to exit the site, as evidenced during this flow test. dozerSep 27, 2011
IMG_9059.jpg
Walkway PourIn preparation for the walkway pour there is a rebar mesh put in place with spacing every 20 centimeters. dozerSep 27, 2011
IMG_9060.jpg
Poured WalkwayThe view after the walkway pour prior to the final smoothing of the concrete. This is hand mix concrete, you can tell it is about the right consistency since there is a minimum of water near the surface, and will become further evident during the final smoothing process. dozerSep 27, 2011
IMG_9262.jpg
Electric Conduit Run in Drive Way ColumnsThe yellow conduit is laid in place in the left drive way column. The wire strands are in place to support the wall lighting and the door bell.dozerSep 27, 2011
IMG_9299.jpg
Electric Routed to Wall LightingElectric is routed in the upper perimeter wall ring beam. dozerSep 27, 2011