Deep Water Well: A rig at work drilling a deep water well. (03-Apr-04)dozerSep 28, 2011
|
|
Painted and finished wall section with decorative security metal. (15-Aug-04)dozerSep 28, 2011
|
|
Another thing worth noting. If cheap paint is used on wall sections it will not last long. This section was just painted a few weeks before. (25-Jul-04) dozerSep 28, 2011
|
|
A close up showing that the post was poured before the blocks were laid in, not after.dozerSep 28, 2011
|
|
You can see from a close examination of this wall section that the post was not correctly poured around the blocks. (14-Jul-04) dozerSep 28, 2011
|
|
WALL EXAMINATION: A good enough looking wall section but can you notice two things? The posts are far apart (3.5 meters) and the fact that you can see the imprint of the underlying blocks indicates that the stucco layer applied was very thin. (06-Jul-04)dozerSep 28, 2011
|
|
Finished wall section with some decorative brickwork on the entry posts. (06-Jul-04)dozerSep 28, 2011
|
|
This application was finished off with two main entry posts and an entry gate. A layer of bricks was used on top of these prefabricated entry posts for an artistic look. (06-Jul-04).dozerSep 28, 2011
|
|
Finishing touches applied to the top of the perimeter wall foundation post.dozerSep 28, 2011
|
|
Stucco being applied to the perimeter wall.dozerSep 28, 2011
|
|
Laying a brick in place.dozerSep 28, 2011
|
|
To apply decorative tiles around a perimeter wall foundation post, the brick layer creates a rig which sits on top of the post and has 'straight-line' nylon line running down the side. (28-Jun-04)dozerSep 28, 2011
|
|