Painting a frame. The frames are all painted oak color, where the windows and doors were varnished.dozerSep 27, 2011
|
|

A mounted inside solid wood door prior to being varnished.dozerSep 27, 2011
|
|

Fitting a door in place. (22-Jun-04)dozerSep 27, 2011
|
|

Attaching a window to the frame.dozerSep 27, 2011
|
|

A close up of the top and bottom sliding hinge used throughout. I think these look better than the side mounted hinges. (19-Jun-04)dozerSep 27, 2011
|
|

The windows being prepared for the top and bottom hinges. (18-Jun-04)dozerSep 27, 2011
|
|

This cabinet door shows the use of anchor nails. Anchor nails are inserted at about 10 centimeter intervals and will be used as a strengthening anchor to the frame of the surrounding wall surface. (13-May-04)dozerSep 27, 2011
|
|

A close up of a clear block. There is one centimeter of cement used between the blocks. (21-Apr-04)dozerSep 27, 2011
|
|

This shows the frame after stucco has been partially applied. (17-Apr-04)dozerSep 27, 2011
|
|

This shows a repair job on the clear glass bricks installed in the large bathroom. The first go round there was not any cement used between the bricks. (09-Apr-04)dozerSep 27, 2011
|
|

An embedded anchor nail. These nails are put in the door frame at regular intervals (about 15 centimeters apart) and used to anchor the frame to the wall.dozerSep 27, 2011
|
|

Rear door being repaired. The first time the door was framed without using anchor nails and had to be redone. It is in the process of be reframed. (02-Apr-04)dozerSep 27, 2011
|
|