happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section

Last additions - Original Coolthaihouse Section
DSC00091.jpg
The house footing being formed. The footing of this house is about 20 inches tall. Inside the footing there is a metal substructure for strength. Off to the left of this footing you can see the hand tied metal substructure in preparation to pour another footing. To the right you see the form wood which is used to form the concrete pour. (05-Mar-04)dozerSep 28, 2011
DSC00075.jpg
The footing of a foundation column. (29-Feb-04)dozerSep 28, 2011
DSC00040.jpg
The perimeter wall is mostly completed. Still needs to be stuccoed. (27-Jan-04)dozerSep 28, 2011
DSC00014~0.jpg
This is the starting shot, showing the plot leveled. The plot starts before the truck on the left and goes to the corner tree line. By this point the plot has already been leveled with fill dirt. (01-Jan-04)dozerSep 28, 2011
SAVE0002.JPG
This is one sheet of the original plan which is a pretty good representation of the layout of the house. The overall shape of the house is a rectangle of 9 * 18 meters. It features 2 nice size bedrooms of 5 * 3.5 meters each. There have been some modifications: The patio is larger than shown, being 3.5 * 4 meters. Also the back bedroom was modified to be 3.5 * 5 meters, which enlarged the kitchen to 3 * 3 metedozerSep 28, 2011
DSC05151.JPG
View from patio. Note the flower boxes have been completed along with putting paving stones on the pathway.dozerSep 28, 2011
DSC05150.JPG
Entry way to patio. (22-Aug-04)dozerSep 28, 2011
DSC05121.JPG
The back of the house.dozerSep 28, 2011
DSC05120.JPG
House from the right.dozerSep 28, 2011
DSC05119.JPG
House, left view. (13-Aug-04)dozerSep 28, 2011
DSC05017.JPG
Large bathroom sink.dozerSep 28, 2011
DSC05016.JPG
Large bathroom.dozerSep 28, 2011
749 files on 63 page(s) 48

Debug Info 
Debug Output: show / hide