|
Last additions - Original Coolthaihouse Section |
The house footing being formed. The footing of this house is about 20 inches tall. Inside the footing there is a metal substructure for strength. Off to the left of this footing you can see the hand tied metal substructure in preparation to pour another footing. To the right you see the form wood which is used to form the concrete pour. (05-Mar-04)dozerSep 28, 2011
|
|
The footing of a foundation column. (29-Feb-04)dozerSep 28, 2011
|
|
The perimeter wall is mostly completed. Still needs to be stuccoed. (27-Jan-04)dozerSep 28, 2011
|
|
This is the starting shot, showing the plot leveled. The plot starts before the truck on the left and goes to the corner tree line. By this point the plot has already been leveled with fill dirt. (01-Jan-04)dozerSep 28, 2011
|
|
This is one sheet of the original plan which is a pretty good representation of the layout of the house. The overall shape of the house is a rectangle of 9 * 18 meters. It features 2 nice size bedrooms of 5 * 3.5 meters each. There have been some modifications: The patio is larger than shown, being 3.5 * 4 meters. Also the back bedroom was modified to be 3.5 * 5 meters, which enlarged the kitchen to 3 * 3 metedozerSep 28, 2011
|
|
View from patio. Note the flower boxes have been completed along with putting paving stones on the pathway.dozerSep 28, 2011
|
|
Entry way to patio. (22-Aug-04)dozerSep 28, 2011
|
|
The back of the house.dozerSep 28, 2011
|
|
House from the right.dozerSep 28, 2011
|
|
House, left view. (13-Aug-04)dozerSep 28, 2011
|
|
Large bathroom sink.dozerSep 28, 2011
|
|
Large bathroom.dozerSep 28, 2011
|
|
749 files on 63 page(s) |
|
|
|
|
|
48 | |
|
|
|
|
|
|
|