DSC03017.jpg
The house as it looks today. (19-May-04)dozerSep 28, 2011
DSC02149.jpg
This shot shows a piece of tile being laid in. A straight line is used as a guide. Also the line is used to evaluate the level of the tile (so that any unevenness in the floor is taken care of). (14-May-04)dozerSep 28, 2011
DSC02137.jpg
This shot shows how the kitchen cabinets were formed. First off the counter is poured cement with a wire mesh cross support. This cross support is anchored in the wall. Then bricks are laid and finally the doors are placed. The doors are anchored into place with nails affixed to the side of the frame. (14-May-04)dozerSep 28, 2011
DSC02109.jpg
This shows the sheetrock roof in the main house area with prep holes for the down lights. (12-May-04)dozerSep 28, 2011
DSC02039.jpg
The repaired roof valley. This was kind of a struggle due to inadequate valley aluminum which was then compensated for by using two pieces which are welded together. In any event the valley now looks good and there is no problem with water leakage. (02-May-04)dozerSep 28, 2011
DSC01150.jpg
This shot shows the front facia board which can be made of either wood or synthetic. We are using synthetic version which is formed from cement. Also note the wood framing is being put in place to attach the outdoor roofing material (grc sheeting). (25-Apr-04)dozerSep 28, 2011
DSC01131.jpg
For each bathroom there are 2 septic tanks, dirty water and solid waste. Standard depth is 4 cement drainage rings, we use 5 which is better. This shot shows the solid waste septic on the left (servicing the small bathroom). The PVC which runs from the toilet is 4" in diameter. (22-Apr-04)dozerSep 28, 2011
DSC01056.jpg
Stucco is what gives strength to the wall. Notice the thickness of the stucco shown here. This is the front exterior wall. (17-Apr-04)dozerSep 28, 2011
DSC00152.jpg
This shows the rear door being framed. This is a repair job, since on the first attempt anchor nails were not used. This time nails will be placed at 4" intervals to anchor the door in place. (02-Apr-04)dozerSep 28, 2011
DSC00108.jpg
Here the roof is partially tiled. The left shot shows the parking lot and patio. The right shot shows the main roof sections. Notice the aluminum drainage sheeting shown in the valley of the right hand picture: it is not really sufficient and will need to be supplemented later. (22-Mar-04)dozerSep 28, 2011
DSC00107.jpg
Here the roof is partially tiled. The left shot shows the parking lot and patio. The right shot shows the main roof sections. Notice the aluminum drainage sheeting shown in the valley of the right hand picture: it is not really sufficient and will need to be supplemented later. (22-Mar-04)dozerSep 28, 2011
DSC00100.jpg
The roof structure is built using heavy guage steel. The bigger pieces are 4 *2 inches and 1.6 mm thick. The smaller pieces are 1 by 1 inch and 1.6 mm thick. The roof tile will lie on the 1 by 1's, so they must be placed at the proper interval. Notice the cross beam supports which sit on top of the foundation posts. (13-Mar-04)dozerSep 28, 2011