DSC01132.jpg
The row of septics is dug behind the house. There are two groups of pairs of septics. From this side the sequence would be toilet, water runoff, water runoff, toilet. dozerSep 28, 2011
DSC01131~0.jpg
This shows the toilet septic for the small bathroom. In all there are 4 septic tanks, 2 for water runoff and 2 for toilets. There are 5 cement rings used for each one, the standard being 4. Each ring is 1.2 meters in diameter.dozerSep 28, 2011
DSC01130.jpg
A septic being dug. (22-Apr-04)dozerSep 28, 2011
DSC00103.jpg
The small bathroom with 4" PVC for the toilet.dozerSep 28, 2011
DSC00102.jpg
The framed small bathroom. (13-Mar-04)dozerSep 28, 2011
DSC05158.jpg
The wall exhaust fan looks like this. It is wired to a separate switch on the right hand side of the sink. (24-Aug-04)dozerSep 28, 2011
DSC05013.jpg
Finished cabinet section. The cabinet doors have been varnished with three coats of good quality wood varnish.dozerSep 28, 2011
DSC05012.jpg
Finished cabinet section with stainless sink installed. (06-Jul-04)dozerSep 28, 2011
DSC04045.jpg
Affixing grout to the tiles on the inside of the cabinets. (19-Jun-04)dozerSep 28, 2011
DSC03072.jpg
Affixing grout to the kitchen floor tiles. (27-May-04)dozerSep 28, 2011
DSC03066~0.jpg
Floor tiles. (26-May-04)dozerSep 28, 2011
DSC03055.jpg
Partial wall tile completed. dozerSep 28, 2011