The large bathroom cabinet. dozerSep 28, 2011
|
|
The 75 liter hot water heater which is mounted on the kitchen wall. This feeds hot water throughout the house.dozerSep 28, 2011
|
|
Cabinet in progress in the large bathroom. (21-Jun-04)dozerSep 28, 2011
|
|
The sink cabinet being formed in the small bathroom. The cabinet is made from bricks. Note the metal on the right which is used to add strength. Holes are drilled in the wall and the metal is inserted prior to the final cement being laid on top.dozerSep 28, 2011
|
|
Completed and tiled shower enclosure base. (20-Jun-04)dozerSep 28, 2011
|
|
This shows the base for the shower enclosure in the small bathroom. Tile is being applied. (19-Jun-04)dozerSep 28, 2011
|
|
The plumber is applying tile grout. (14-Jun-04)dozerSep 28, 2011
|
|
Large bathroom after tiling is almost complete. The water runoff drain is on the far left (near the bathtub area). The bathtub still needs to be plumbed in. (12-Jun-04)dozerSep 28, 2011
|
|
Concrete walkway in the rear being finished off, showing two septic exhausts. Note also the metal brackets on the wall which are used as a support for the water heater which is a wall mount and resides in the kitchen.dozerSep 28, 2011
|
|
Concrete is poured over the hot and cold water pipes. Also note the septic exhaust. (07-Jun-04)dozerSep 28, 2011
|
|
Large bathroom after cement has just been poured. (05-Jun-04)dozerSep 28, 2011
|
|
Water runoff pipes run into the septic like this. (05-Jun-04)dozerSep 28, 2011
|
|