happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > Original Coolthaihouse Section

Last additions - Original Coolthaihouse Section
DSC02139~0.jpg
Here stucco has been affixed.dozerSep 28, 2011
DSC02137~1.jpg
Each cabinet section has a wood door.dozerSep 28, 2011
DSC02136~0.jpg
A counter section after the red brick enclosure is complete. (14-May-04)dozerSep 28, 2011
DSC02134~2.jpg
Nails are used on the outside of the cabinet to anchor to the surrounding wall. dozerSep 28, 2011
DSC02133~0.jpg
Metal rebar (2 hun) is used in forming the brick column supports to add strength. A hole is drilled in the wall so the metal can be inserted.dozerSep 28, 2011
DSC02116~0.jpg
Partially finished counter with supporting brick columns.dozerSep 28, 2011
DSC02113~0.jpg
The counter will be supported by red brick columns. (13-May-04)dozerSep 28, 2011
DSC02009~0.jpg
The counter after the cement pour. (27-Apr-04)dozerSep 28, 2011
DSC02008~0.jpg
Pouring cement to form the counter.dozerSep 28, 2011
DSC02002~0.jpg
The red bricks designate where the sink will go. dozerSep 28, 2011
DSC02001~0.jpg
Sample Kitchen #1: The metal for the kitchen counter is secured on top of some grc sheets and drilled into the wall prior to pouring cement. (26-Apr-04)dozerSep 28, 2011
DSC00140.jpg
Sample Kitchen #2: Simple kitchen design in a small house. (28-Mar-04)dozerSep 28, 2011
749 files on 63 page(s) 13

Debug Info 
Debug Output: show / hide