|
Last additions - Original Coolthaihouse Section |
Bathrooms will normally have windows set up at a height of 2.5 meters, like shown here. (28-Mar-04)dozerSep 28, 2011
|
|
The wall exhaust fan looks like this. It is wired to a separate switch on the right hand side of the sink. (24-Aug-04)dozerSep 28, 2011
|
|
Finished cabinet section. The cabinet doors have been varnished with three coats of good quality wood varnish.dozerSep 28, 2011
|
|
Finished cabinet section with stainless sink installed. (06-Jul-04)dozerSep 28, 2011
|
|
Affixing grout to the tiles on the inside of the cabinets. (19-Jun-04)dozerSep 28, 2011
|
|
Affixing grout to the kitchen floor tiles. (27-May-04)dozerSep 28, 2011
|
|
Floor tiles. (26-May-04)dozerSep 28, 2011
|
|
Partial wall tile completed. dozerSep 28, 2011
|
|
The cement surface of the cabinets is rough finished to allow the tiles to affix easily. dozerSep 28, 2011
|
|
This shows the opening formed for the exhaust fan. The opening is made from a wood frame cemented in place in the wall. The fan fits in place and can be slid out for cleaning. (18-May-04)dozerSep 28, 2011
|
|
This shows the rough finish on the stucco and the tiles being applied. Cement unmixed with sand is used as the affixing agent. (15-May-04)dozerSep 28, 2011
|
|
This shows a relatively think layer of stucco is applied.dozerSep 28, 2011
|
|
749 files on 63 page(s) |
|
|
|
|
|
12 | |
|
|
|
|
|
|
|