This is the land plot after some fill dirt has been brought in (to the left of the truck). It is 84 square wah. (01-Jan-04) dozerSep 28, 2011
|
|

The front gutter system. (15-Aug-04)dozerSep 28, 2011
|
|

The rear gutter and down spout.(13-Aug-04)dozerSep 28, 2011
|
|

Added the final gutter on top of the patio. (23-Jun-04)dozerSep 28, 2011
|
|

Interconnected gutters. (19-Jun-04)dozerSep 28, 2011
|
|

Brackets.dozerSep 28, 2011
|
|

A completed gutter section. (18-Jun-04)dozerSep 28, 2011
|
|

Installing brackets for the 6" gutter sections. (16-Jun-04)dozerSep 28, 2011
|
|

View of planter boxes from patio. (22-Aug-04)dozerSep 28, 2011
|
|

The resulting paving stone walkway. (12-Aug-04)dozerSep 28, 2011
|
|

The paving stones are set in place.dozerSep 28, 2011
|
|

Fine sand is leveled. (31-Jul-04)dozerSep 28, 2011
|
|