happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Village House

Last additions - Village House
IMG_8483.jpg
Cinder block wall prior to render. Note that he columns were poured after the blocks were laid to prevent cracking/weakness at the junction. dozerSep 28, 2011
DSC02458.JPG
The footing for the bathroom. The ground beam will be on top of this.dozerSep 28, 2011
DSC02451.JPG
The external bathroom footing with the rebar footing pad in place. dozerSep 28, 2011
IMG_2834.JPG
Side view of the house, still partially finished. The bathroom is in the rear (with two glass blocks). dozerSep 28, 2011
IMG_1771.JPG
Approximate wall thickness after rendering, about 8 cm. dozerSep 28, 2011
IMG_1770.JPG
dozerSep 28, 2011
DSC02675.JPG
The interior after the pour of the floor and walls rendered. The floor was poured 8 - 10 cm and broomed rough in preparation for floor tiles. dozerSep 28, 2011
DSC02599.JPG
After the exterior walls have been rendered. dozerSep 28, 2011
DSC02582.JPG
The exterior prior to rendering the surface. dozerSep 28, 2011
DSC02450.JPG
With this type of roofing the are two parallel c sections done on each ridge. Notice also the roofing is affixed to the metal by using a u bolt which penetrates the roof sheeting. dozerSep 28, 2011
DSC02449.JPG
Galvanized metal that comes in a roll 90cm wide is used to form the gutter. It is shaped so that it has a 10 cm wide gutter area which fits in the two parallel roof c sections. dozerSep 28, 2011
DSC02448.JPG
At this stage the roofing has been done (notice if it was heavy roofing the walls would be completed first). dozerSep 28, 2011
35 files on 3 page(s) 2

Debug Info 
Debug Output: show / hide