|

Last additions - Details |

This type of down lighting snaps in place and 'grabs' the drywall. The cheaper varieties are harder to install. (17-Jun-04)dozerSep 28, 2011
|
|

A roof after the taping is complete.
dozerSep 28, 2011
|
|

Mixing up a bucket of taping cement.dozerSep 28, 2011
|
|

Taping the sheetrock seams. (07-Jun-04)dozerSep 28, 2011
|
|

Electric conduit will lay on top of the metal support structure. (18-May-04)dozerSep 28, 2011
|
|

Sheetrock laid in place with cut outs for lighting and fan. (12-May-04)dozerSep 28, 2011
|
|

Installing sheetrock. (11-May-04)dozerSep 28, 2011
|
|

Checking the frame. (07-May-04)dozerSep 28, 2011
|
|

And it attaches to the support metal like this. (06-May-04)dozerSep 28, 2011
|
|

Metal supports are spaced at about 2/3 meter square.dozerSep 28, 2011
|
|

The metal frame is supported by attachment to the truss metal. (05-May-04)dozerSep 28, 2011
|
|

The support metal for the sheetrock (the U shaped metal piece). (27-Apr-04)dozerSep 28, 2011
|
|
|

|
|
|