|

Last additions - Details |

Partial wall tile completed. dozerSep 28, 2011
|
|

The cement surface of the cabinets is rough finished to allow the tiles to affix easily. dozerSep 28, 2011
|
|

This shows the opening formed for the exhaust fan. The opening is made from a wood frame cemented in place in the wall. The fan fits in place and can be slid out for cleaning. (18-May-04)dozerSep 28, 2011
|
|

This shows the rough finish on the stucco and the tiles being applied. Cement unmixed with sand is used as the affixing agent. (15-May-04)dozerSep 28, 2011
|
|

This shows a relatively think layer of stucco is applied.dozerSep 28, 2011
|
|

Here stucco has been affixed.dozerSep 28, 2011
|
|

Each cabinet section has a wood door.dozerSep 28, 2011
|
|

A counter section after the red brick enclosure is complete. (14-May-04)dozerSep 28, 2011
|
|

Nails are used on the outside of the cabinet to anchor to the surrounding wall. dozerSep 28, 2011
|
|

Metal rebar (2 hun) is used in forming the brick column supports to add strength. A hole is drilled in the wall so the metal can be inserted.dozerSep 28, 2011
|
|

Partially finished counter with supporting brick columns.dozerSep 28, 2011
|
|

The counter will be supported by red brick columns. (13-May-04)dozerSep 28, 2011
|
|
|

|
|
|