|
Last additions - Original Coolthaihouse Info |
This shows a 'straight line' of clear nylon line which is used to make sure the rows are laid straight and also to make sure the tops of the tile are flat and at the proper level. dozerSep 28, 2011
|
|
Here a tile is being set in place.dozerSep 28, 2011
|
|
After the floor is poured a level layer of cement is leveled in a row and tiles are placed on top of it and tapped into place. (13-May-04)dozerSep 28, 2011
|
|
The traces of underlying blocks will show until the cement dries. Before painting is a good time to examine the surface for cracks. (25-Apr-04)dozerSep 28, 2011
|
|
The foundation posts are finished off by having decorative corners added. (19-Apr-04)dozerSep 28, 2011
|
|
Stucco applied to the front of the house. (19-Apr-04)dozerSep 28, 2011
|
|
The stucco coat is thick as seen here, at least 1 centimeter thick. (17-Apr-04)dozerSep 28, 2011
|
|
Stucco being applied to the rear of the house. (09-Apr-04)dozerSep 28, 2011
|
|
The stucco is applied in coats. This is a rough coat. (02-Apr-04)dozerSep 28, 2011
|
|
The stucco being smoothed in the finishing coat.dozerSep 28, 2011
|
|
Completed rough wall section.dozerSep 28, 2011
|
|
The blocks are laid in rows with cement in-between. (28-Mar-04)dozerSep 28, 2011
|
|
329 files on 28 page(s) |
|
|
|
|
|
22 | |
|
|
|
|
|
|
|