|
Last additions - Colorado's Gallery |
The Half-Rai organic farmJust the bit of farmed ground up to, but not including the big tamarind tree. A bit of a shed there, which fronts the road on the NE corner of the property.ColoradoJan 28, 2012
|
|
Excavation for footings - 8 Oct 2011A bit of foundation digging and the 15cm of fertile topsoil has disappeared.ColoradoJan 28, 2012
|
|
View of property from NEGoes up to the trees, but not into them. We are surrounded by green for now, but sure that will change. So building to have internal gardens to view.ColoradoJan 28, 2012
|
|
First footing excavation - 5 Oct 2011About 15cm of topsoil supported this organic farm, below is all hard packed sand. Smooth digging.ColoradoJan 28, 2012
|
|
House FloorplanActually 2 houses under 1 roof with a kitchen/breezeway separating them. N house is a mother-in-law apartment.ColoradoJan 28, 2012
|
|
Land LayoutOur 1/2 rai. 17-18m by 40-47m. N is up. An early plan. The house was roughly centered N-S later, making front, side and back garden areas. ColoradoJan 28, 2012
|
|
|
|
Lot Layout N-upOur 1/2 rai. Right-side-up (until I figure out how to delete the upside-down one). 17-18m by 40-47m. An early plan. The house was roughly centered N-S later, making front, side and back garden areas. ColoradoJan 28, 2012
|
|
Lot LayoutOur 1/2 rai. Upside-down (N is to the bottom). 17-18m by 40-47m. An early plan. The house was roughly centered N-S later, making front, side and back garden areas. ColoradoJan 27, 2012
|
|
Floor planActually 2 houses under 1 roof, separated by a covered breezeway/kitchen. N house is to front of property, a mother-in-law apartment... though we'll squeeze in Mom & Dad.ColoradoJan 27, 2012
|
|
|
|
|
|
|