|

Last additions - changnoi's Gallery |

After the Groundfloor has set we start the wallsNo hanging around here straight on with starting the walls this weekend.changnoiDec 06, 2009
|
|

Prep for Concrete PourThis view shows the prep going on prior to the pour of concrete and shows where the balconey will be on the side of the house. This area along with all bathrooms will be poured seperately as it will be lower than the ground floor with a slight slope for water drainage.changnoiDec 06, 2009
|
|

Groundfloor CastThis was the day after the concrete pour and already hard so started building wallschangnoiDec 06, 2009
|
|

Formwork for uner neath the Upper Ring BeamschangnoiNov 29, 2009
|
|

View of the metalwork for Upper Ring BeamschangnoiNov 29, 2009
|
|

From the back to the frontchangnoiNov 29, 2009
|
|

A View through the lounge areaCan you see it I can, the lounge then after that the deck area, then Mum's room etc etcchangnoiNov 29, 2009
|
|
|

View of the metalwork for Upper Ring BeamschangnoiNov 29, 2009
|
|

View of the metalwork for Upper Ring BeamsCorner and columnchangnoiNov 29, 2009
|
|

View of the metalwork for Upper Ring BeamsFrom the mid-way to the front.changnoiNov 29, 2009
|
|

View of the metalwork for Upper Ring BeamsFrom the soichangnoiNov 29, 2009
|
|
406 files on 34 page(s) |
 |
 |
 |
 |
 |
28 |  |
 |
 |
 |
|

|
|
|