Last additions - Chok Dee #2 |
Kitchen PaintingThe kitchen being painted. The paint used was super shield (both primer and the finish coat). The kitchen and bathroom are semi gloss (washable) while the rest of the house are done in matte. dozerSep 27, 2011
|
|
Counter Prep for GraniteThe counter is being prepped for laying in the granite slabs. dozerSep 27, 2011
|
|
Slab put in PlaceHere the granite slab is set into place. The holes and edges are cut at the stone factory. The sinks were used by the factory to guarantee a perfect opening for the under mount sinks. The faucet holes will be drilled on site.dozerSep 27, 2011
|
|
Faucet HolesThe faucet holes are drilled on site by the granite people. A special bit is used and water is poured during the during the drilling process to avoid having the granite surface crack. dozerSep 27, 2011
|
|
Painting Door TrimThe door frame being painted. The sides are properly masked prior to painting. dozerSep 27, 2011
|
|
Wood Trim being AppliedWood trim being applied to the corner section of the tiered ceiling. Glue is applied to the underside of the trim prior to nailing in place via an air gun. dozerSep 27, 2011
|
|
Wall Tiles AppliedThe lower row of tiles is supported by concrete nails. This level is where the floor tiles will be after they are laid. Spacers are used to ensure consistent spacing. The surface is roughed prior to laying the tiles.dozerSep 27, 2011
|
|
Joint RepairThe joints are puttied to make so the wood looks as if it were one piece. The joints are miter cut to fit together at a 45 degree angle.dozerSep 27, 2011
|
|
PuttyThe fill putty is colored using the urethane as applied to the original wood trim to achieve a matching color. dozerSep 27, 2011
|
|
Painting the Patio CeilingThe patio ceiling is made of the water resistant drywall plasterboard. Here a primer coat is being applied. dozerSep 27, 2011
|
|
Bathroom Sink CounterPreparation for the pour of the bathroom sink. The same method is used as in the kitchen counter, the rebar used in the 6 mm thickness. The concrete will not be poured in the circular area where the sink will go and an open area will be left for the faucet. dozerSep 27, 2011
|
|
Counter after PourThe bathroom counter after the pour. The faucet will set off to the right side of the sink where the PVC pipe is. dozerSep 27, 2011
|
|