happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Chok Dee #2

Last additions - Chok Dee #2
IMG_9726.jpg
Colored Render Applied to Patio EdgesA colored render is being applied to the patio edges. This will look at lot better than paint and matches nicely with the coloration of the tiles.dozerSep 27, 2011
IMG_9729.jpg
Grouting the PatioA premium grout (mold resistant) was used throughout the house.dozerSep 27, 2011
IMG_9733.jpg
Aluminum DoorThe heavy duty aluminum door being fitted into place. This is a swing type door. dozerSep 27, 2011
IMG_9746.jpg
Door Glass InstallationThe door glass is locked in place. dozerSep 27, 2011
IMG_9464.jpg
Tile CuttersTile cutters make a smoother cut than a grinder but are often not used in other projects.dozerSep 27, 2011
IMG_9468.jpg
Counter TilesThe kitchen cabinet tiles are off white tiles spaced at 3 mm intervals. dozerSep 27, 2011
IMG_9573.jpg
White Aluminum Window FramesThe windows opening are measured and the frames are then installed to fit. This is the more expensive 1.2 mm thick white aluminum. Note that most installations do not use the frame piece, which adds to the durability + is a decorative addition.dozerSep 27, 2011
IMG_9580.jpg
Special Grout for Glass BlocksA special grout that is designed specifically for glass blocks is used in the trim areas around the blocks. dozerSep 27, 2011
IMG_9581.jpg
Nearly Finished Counter CabinetsThe counter nearly finished. dozerSep 27, 2011
IMG_9586.jpg
Ceiling in KitchenThe ceiling in the kitchen after the installation of the trim wood.dozerSep 27, 2011
IMG_9609.jpg
Gate Being WeldedThe gate being welded. dozerSep 27, 2011
IMG_9622.jpg
Level LineA long clear plastic tubing is used to create a level line which will be used to set the top level for the floor tiles. The tube is filled with water, on one end a line is marked at the water line. At a different area perhaps several meters away another mark is made (in is a two man process). This two independent marks will be at the same level and measurement can be made from this point downwards to determine the target level for the tiles. dozerSep 27, 2011
208 files on 18 page(s) 3

Debug Info 
Debug Output: show / hide