|
Last additions - User galleries |
1 AprilThis is Sparky's first real brain fart of sorts. Several outlets and switches are going in this wall and there is no wall yet so he chose this method to get his part done and let the wall guy fill in around the stuff. It's not pretty but it will work and when the walls are finished you'll never see this,,,so mai phen raipklongballApr 01, 2009
|
|
1 AprilSome more of the electricians handiwork. All the boxes he installed today come up the wall and join the raceway above the kitchen ceiling.pklongballApr 01, 2009
|
|
28 March 2009This is Sparky using his heat gun to heat and bend the pipe to connect to the raceway. He keeps a bottle of water handy to cool the pipe so it holds its shape after bendingpklongballMar 28, 2009
|
|
28 March 2009This view of the panel shows how Sparky ran the conduits down the wall and under the floor.pklongballMar 28, 2009
|
|
28 March 2009Today the main panel is installed and all the conduits are in place both up to the raceway for the feeder cables and down under the floor for the main supply cables and the feeders to and from the car park panel. We have added a small box next to the panel that will have the RG 6U cables (TV & True) and telephone cables in and out.pklongballMar 28, 2009
|
|
28 March 2009More conduit runs to the raceway. These two will be in a wall but the wall is not finished yet.pklongballMar 28, 2009
|
|
28 March 2009View of the junction of the yellow pvc to the raceway from several outlets and switch boxespklongballMar 28, 2009
|
|
26 March 2009A general view looking to the bedroom door and two of the team discussing what beer they will drink with dinner tonight. One of the wall crew is up on the scaffolding working a wall that will be the back of the store roompklongballMar 26, 2009
|
|
26 March 2009From this angle we can get a glimpse of one of the carpenters who handles the forms for the window openings. This is one in the guest bedroom being readiedpklongballMar 26, 2009
|
|
26 March 2009Another day and more of the roof tile is completed. Almost finished nowpklongballMar 26, 2009
|
|
26 March 2009And now it's time for the door frames. This one is being set in for the kitchen door to the back patiopklongballMar 26, 2009
|
|
26 March 2009And here we have a section that is ready for the cables. 4 conduits were bent using a heat gun,,,yes I said heat gun not lighter or some sort of fire on a stick, then attached to holes cut into the bottom of the channel. And the use of the connector and bushings is another requirementpklongballMar 26, 2009
|
|
5254 files on 438 page(s) |
|
|
|
|
|
316 | |
|
|
|
|
|
|
|