5 MayThis part of the living room ceiling shows the 30 cm step from the lower to higher ceiling. The larger 30cm step was decided to allow install of the ceiling aircon unit later.pklongballMay 05, 2009
|
|
|

5 MayThe ceiling boys were in today and they go more "rock" installed. Here we can see a square hole that will be a service access to the attic space.pklongballMay 05, 2009
|
|

2 MayI think I posted this photo once but just in case here again is the septic tank and the drain pipes from the housepklongballMay 02, 2009
|
|

2 MayAnother angle of the back stepspklongballMay 02, 2009
|
|

2 MayI popped the cover so you can see how simple a device this "grease"trap is. But it IS a necessity to contain the "stuff" wifey washes down the drain. Edit here: Can anyone tell me if the metal strainer basket is installed correctly? I think it looks backasswards.pklongballMay 02, 2009
|
|

2 MayA view looking along the back wall and the partly buried drain pipes and boxes.pklongballMay 02, 2009
|
|

2 MayA view from the back looking at the now partially complete back veranda steps. Should look good whn he's done and the tile and sandwash are in place.pklongballMay 02, 2009
|
|

2 MayWe see the stair man working on the second of 3 steps up/down from the back veranda. pklongballMay 02, 2009
|
|

29 AprilMore of the pipes as they come to the yet to be installed sewer pipe.pklongballMay 02, 2009
|
|

29 AprilAs the pipes exit the opening going to the septic and drain pipes. PLEASE NOTE THE U_TRAP NEAR THE OPENING! There are two of these on the shower floor/sink drain lines from each bath roompklongballMay 02, 2009
|
|

29 AprilNow a view from the crawl space opening and we can see the finished rough in for the bath pipingpklongballMay 02, 2009
|
|