|
Last additions - User galleries |
June 12The wall man is adding the finish to the now completed column in the backpklongballJun 12, 2009
|
|
June 8I will not say I was reaching for the moon here just giving a perspective as to how high the ceiling is in relation to my six feet plus outstreched armpklongballJun 12, 2009
|
|
June 8One of the built-in crew do some wood workingpklongballJun 12, 2009
|
|
June 8This guy stood on this ladder like this for at least 20 minutes trying to snake an electric cable down behind the cabinet to the place where a lite will be locatedpklongballJun 12, 2009
|
|
June 10Work has moved to the point of the almost finished look for the window. These panels will be a double bi-fold to each side to allow the opening.pklongballJun 12, 2009
|
|
June 10All the base and wall units are installed now and the work moves to finishing the doors and suchpklongballJun 12, 2009
|
|
June 7More of the crew adding the sand wash to the rear stepspklongballJun 12, 2009
|
|
June 7A different angle but the same day and more of the same sand wash stepspklongballJun 12, 2009
|
|
June 7The cabinet folks are also adding the finishing touches to the pass through window in the kitchen. pklongballJun 12, 2009
|
|
June 8This may seem like an odd view of the front doors but when hardware shopping I needed to show this to the guy so he knew the type of edges of the door halvespklongballJun 12, 2009
|
|
June 6The work in the kitchen is moving along and now the sink base is in place along with the wall units oven the HOB areapklongballJun 12, 2009
|
|
June 6Looking to the wall units for the exhaust hood and oven/microwavepklongballJun 12, 2009
|
|
5254 files on 438 page(s) |
|
|
|
|
|
282 | |
|
|
|
|
|
|
|