|
Last additions - User galleries |
July 7The main room fan has this rotary control switch instead of the pull chain on the fanpklongballJul 09, 2009
|
|
July 7Master bedroom fan unit in placepklongballJul 09, 2009
|
|
July 6Side of the house after the rain last night. More standing water but not too bad herepklongballJul 09, 2009
|
|
July 7Two down lights will light the sidewalk to the back steps.pklongballJul 09, 2009
|
|
July 7Another of the down lights at the top of the front stepspklongballJul 09, 2009
|
|
July 7Sparky has installed most of the lights now. Here we have the main room chandelierpklongballJul 09, 2009
|
|
July 1The finishing stages of placing the driveway curbingpklongballJul 09, 2009
|
|
July 6We had a pretty heavy rain overnight and this is the stading water from that storm. We will need to re-grade this area to drain a bit better. Tractor man promised us some available time yet.pklongballJul 09, 2009
|
|
July 6Double width pad area for the two compressorspklongballJul 09, 2009
|
|
July 6Compressor and electric wiring for the guest bedroom AC and the living room ACpklongballJul 09, 2009
|
|
July 6Outdoor location of the master bedroom AC compressor. This spot will be filled with concrete for the pad areapklongballJul 09, 2009
|
|
June 30The delivery of the curbing for the driveway. 105 each of the 50 cm long precast blockspklongballJul 05, 2009
|
|
5254 files on 438 page(s) |
|
|
|
|
|
270 | |
|
|
|
|
|
|
|