height_pegs.jpg
Height Sticks for Concrete PourchangnoiDec 06, 2009
installing_dpc_2.jpg
Damp Proofing preparationchangnoiDec 06, 2009
installing_dpc___mesh_4.jpg
Installing Damp Proofing & MeshchangnoiDec 06, 2009
GF_cast_4_with_wc_pit.jpg
View of whole groundfloor after concrete pourThis shows the groundfloor after the pour from the back to the front on the right where the wc will bechangnoiDec 06, 2009
GF_cast_4_with_wc_pit___pipes.jpg
Ground floor WC after concrete pourchangnoiDec 06, 2009
GF_filled_with_damp_proof_pegs_and_mesh.jpg
Ground floor with damp proof and mesh laidchangnoiDec 06, 2009
gf_mum_bedroom_with_bathroom_pit.jpg
Mums bedroom and Ensuite after the concrete pourchangnoiDec 06, 2009
GF_WC_with_pipes.jpg
Prep for downstairs WCThis shows the pipework installed prior to the concrete pourchangnoiDec 06, 2009
beam_joint.jpg
Upper Ring Beam JointA stunning example of ring beam work.changnoiDec 06, 2009
bending_db1.jpg
A quick shot of DB bending!!changnoiDec 06, 2009
building_walls.jpg
After the Groundfloor has set we start the wallsNo hanging around here straight on with starting the walls this weekend.changnoiDec 06, 2009
GF_balconey.jpg
Prep for Concrete PourThis view shows the prep going on prior to the pour of concrete and shows where the balconey will be on the side of the house. This area along with all bathrooms will be poured seperately as it will be lower than the ground floor with a slight slope for water drainage.changnoiDec 06, 2009