happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries

Last additions - User galleries
P1302831.JPG
Jan.30,2010I'm holding the pressure switch that will operate the pump control. I saw no brand name or where it was made and the install booklet disappeared before I could find it. But I know it will start the pump at about 20 psi and stop it at about 55 psi.pklongballFeb 26, 2010
P1302832.JPG
Jan.30,2010Another view of the pressure control showing the built on pressure gauge. Nice to have.pklongballFeb 26, 2010
P1302833.JPG
Jan.30,2010The area after the well is almost finishedpklongballFeb 26, 2010
P1302834.JPG
Jan.30,2010Here the creww is connecting the pvc piping. No yellow for the electric part just blue for all of it. I was not thrilled with the electric piece of the work and I will make "my" changes soon now that we have the system operatingpklongballFeb 26, 2010
P1292825.JPG
Jan.29,2010And morepklongballFeb 26, 2010
P1302826.JPG
Jan.30,2010Day 3 they crew came back with the Franklin 1 hp pump and control, the automatic pressure switch and several lengths of blue PVC. They wired up the pump and attached the blue pvc in 4 meter lengths and dropped the pump down the hole. pklongballFeb 26, 2010
P1302827.JPG
Jan.30,2010Pump goes first.pklongballFeb 26, 2010
P1302828.JPG
Jan.30,2010Then about 25 or 30 meters of pvcpklongballFeb 26, 2010
P1302829.JPG
Jan.30,2010The bore is capped with a steel pipe fitting and then more pvc to the controlpklongballFeb 26, 2010
P1292818.JPG
Jan.29,2010Just more of the final drilling processpklongballFeb 26, 2010
P1292819.JPG
Jan.29,2010And morepklongballFeb 26, 2010
P1292820.JPG
Jan.29,2010The mess was everywherepklongballFeb 26, 2010
5254 files on 438 page(s) 239

Debug Info 
Debug Output: show / hide