IMG_3052.JPG
awesome sunsetgreat views from the landMax&Bee-in-CMJun 17, 2010
IMG_3064.JPG
clean waterwe have clean water, after a day of muddy waterMax&Bee-in-CMJun 17, 2010
IMG_3147.JPG
main switchour electricity man installed the master switch on our poleMax&Bee-in-CMJun 17, 2010
IMG_3288.JPG
electricity company installed the single phase meterstill deciding whether to get 3 phase power, the quote was for 68,000 baht, or to go ahead with single phase.Max&Bee-in-CMJun 17, 2010
IMG_2848.JPG
drill truckarrives on site ready to drillMax&Bee-in-CMJun 17, 2010
IMG_2859.JPG
heavy escavatorthe soil man needed to bring in a "big macro" to take out some stubborn tree stumps.Max&Bee-in-CMJun 17, 2010
IMG_2915.JPG
drill trucklooks like prospecting for oil, but its not...Max&Bee-in-CMJun 17, 2010
IMG_2926.JPG
drilling the holethe hole was drilled to 60 metres, at a cost of 36,000 baht.
it took about 3 days start to finish for the job.
Max&Bee-in-CMJun 17, 2010
IMG_2930.JPG
beaten up truckthats has got to be one of the most beaten up trucks i have ever seen.Max&Bee-in-CMJun 17, 2010
IMG_2784.JPG
more soilMax&Bee-in-CMJun 17, 2010
IMG_2789.JPG
trying to level it outthe leveling out was ok, but not as smooth as it could have been.Max&Bee-in-CMJun 17, 2010
IMG_2802.JPG
dumping soileach truck costs 350 baht, but we ordered 1.5 rai to a height of 50 cm, for a total cost of 70,000 baht.Max&Bee-in-CMJun 17, 2010