happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries

Last additions - User galleries
DSC_0855.jpg
Roof frame and tilerucus7Jun 20, 2010
IMG_4510.JPG
Foundation of pier1 cubic metre of concrete was poured into the foundation, the rebar cage was set, and the first concrete pipe as lowered into position. By next morning is was all dry. Max&Bee-in-CMJun 19, 2010
IMG_4186.JPG
Drill moldThe wooden board for the drill holes.Max&Bee-in-CMJun 19, 2010
IMG_4188.JPG
Metal platesThe metal plates in the back of the car, looking for a drill shop now. Need to drill 3 plates.Max&Bee-in-CMJun 19, 2010
IMG_4511.JPG
Bottom part of pier doneThe concrete pour went smoothly. Its as solid as a concrete pier.Max&Bee-in-CMJun 19, 2010
hole_1.JPG
Hole #1The hole is dug for the telescope pier.Max&Bee-in-CMJun 19, 2010
hole_1_closed.JPG
Hole #1 closedThe soil people mistakenly dumped soil and closed the hole dug for the pier.Max&Bee-in-CMJun 19, 2010
hole_2.JPG
Hole #2The second hole is dug out by hand, size is 1 m cubed.Max&Bee-in-CMJun 19, 2010
IMG_4112.JPG
Metal rodsThe rods that will be used to secure the 30 cm X 30 cm metal plates to the concrete pier and each other. They will need to be cut to size.Max&Bee-in-CMJun 19, 2010
IMG_4114.JPG
The metal ladyThe local very friendly and helpful metal shop lady. Total cost to cut 3 metal plates (30 cm X 30 cm), and the long bolts and 20 nuts was 1360 baht.Max&Bee-in-CMJun 19, 2010
IMG_4121.JPG
Making boltsCutting the bolts to size - 20 cm for the bolts that will go into the concrete to hold metal plates, and 15 cm bolts to connect the metal plates together.Max&Bee-in-CMJun 19, 2010
IMG_4177.JPG
Rebar frame and pipesTaking shapeMax&Bee-in-CMJun 19, 2010
5254 files on 438 page(s) 225