the plot with simple layoutthe plot accquired due to proximity to family, later was added fill (abt. 1.3m) & set 3 moons or 5 rains for consolidation. A bit of consternation but upon seeing construction, no worries. Seems the area norm. P/L = property line, Fill=area filled to elevate above road and drain ditchesotis-aJun 25, 2010
|
|

footing hole going down all in!normal steel cement const. chaing raiotis-aJun 24, 2010
|
|

column formsnormal steel cement const. chaing raiotis-aJun 24, 2010
|
|

q/c team make steel inspectionnormal steel cement const. chaing raiotis-aJun 24, 2010
|
|

beams going innormal steel cement const. chaing raiotis-aJun 24, 2010
|
|

columns 1st levelnormal steel concreteotis-aJun 24, 2010
|
|

House PlanThe house design is based on Australian home designs from Henley Properties and Simond's Homes. The entrance, study and master bedroom are based on Henley Properties designs, with the rest of the house following design ideas from Simond's Homes.
The area of the house is 250 square metres (including the front porch and rear outdoor area). The quoted price from a builder was 1.7 million baht, however we have decided to manage the project in-family, and are sourcing all the materials ourselves. Max&Bee-in-CMJun 24, 2010
|
|
|

Local small governmentHad to go to the local government office to lodge the building plans, after they had been signed by an engineer.Max&Bee-in-CMJun 24, 2010
|
|

Rebuilding worker houseThe worker's house had to be removed to make room for soil infill, then rebuilt again.Max&Bee-in-CMJun 24, 2010
|
|

Work siteLots of rebar braces done and ready to be used.Max&Bee-in-CMJun 24, 2010
|
|

Baby parkingThe baby is parked in the shadeMax&Bee-in-CMJun 24, 2010
|
|