DSCF4637_resize.jpg
Another angle on the levelled land awaiting construction in 7 months time - after the rainy season which will allow the land to settle.chiymanDec 27, 2010
DSCF4896_resize.jpg
Steel for the Footings placed with Concrete pipes for the below ground sections of the columns supported with yuca poles.chiymanDec 27, 2010
DSCF4898_resize.jpg
Footing in place, supported on clay bricks to allow concrete to flow arround the pad. Pad overall dimension 1.5m x 1.5m steel cage dimension 1.3m x 1.3 m.I had to complete the first stages of the construction quickly so decided to use the conceret pipes to form the below grade section of the columns. This allows backfilling of the footing as soon as the concrete had hardened and avoided the need to construct wooden forms.chiymanDec 27, 2010
DSCF4635_resize.jpg
Land purchased and area leveled ready for construction after settling.chiymanDec 27, 2010
1223MSTRbrFloor.jpg
Master bathroomMisharkDec 19, 2010
1226Columns.JPG
Support beamsMisharkDec 19, 2010
1234BucketPassers.jpg
Bucket Throwers!One way of getting concrete from the ground up to the person on the platform, ready for them to pour into the support column boxing!MisharkDec 19, 2010
1159SmallRooms.jpg
2 smaller rooms + 2 bathroomsMisharkDec 17, 2010
1160LayingPlastic.jpg
Plastic spread before concrete pourMisharkDec 17, 2010
1196CPAC.JPG
CPAC concrete deliveryMisharkDec 17, 2010
1214ConcreteFloorSpread.jpg
CPAC concrete floor being spreadMisharkDec 17, 2010
1187CPAC_CONCRETE.jpg
CPAC Concrete DeliveryMisharkDec 17, 2010