Bathroom drainage connections placed befor pouring the ground floor slabchiymanJan 18, 2011
|
|
The connection pipe from the toilet to the collection tank.chiymanJan 18, 2011
|
|
Toild waste receptical and blue pipe which will discharge water from the shower and wash hand basin.chiymanJan 18, 2011
|
|
Ground floor Bathroom waste water pipework placed in position.chiymanJan 18, 2011
|
|
Ground slab formwork completed and ready for the pour. Concrete mixer, sand, stone and cement ready.chiymanJan 18, 2011
|
|
Ground slab formwork completed and ready for the pourchiymanJan 18, 2011
|
|
Groundfloor formwork completed. Our construction workers lived in the tent which can been seen in the picture. They considered this to be more "professional" than constructing their own temporary accommodation!!chiymanJan 18, 2011
|
|
Ground floor formwork completedchiymanJan 18, 2011
|
|
Ground floor formwork completedchiymanJan 18, 2011
|
|
Ground floor slab formwork completed and ready for concrete pour the next day. The bathroom (with the blue pipe sticking out) will be formed at a lower level and cast seperatelychiymanJan 18, 2011
|
|
The waste from the downstairs toilet will be collected in this tank formed from precast concrete rings - this one is 4 rings deep.chiymanJan 18, 2011
|
|
Ground floor slab completed - the part nearest the concrete mixer will be brushed once it has semi cured.chiymanJan 18, 2011
|
|