DSCF4951.JPG
Bathroom drainage connections placed befor pouring the ground floor slabchiymanJan 18, 2011
DSCF4960.JPG
The connection pipe from the toilet to the collection tank.chiymanJan 18, 2011
DSCF4959.JPG
Toild waste receptical and blue pipe which will discharge water from the shower and wash hand basin.chiymanJan 18, 2011
DSCF4958.JPG
Ground floor Bathroom waste water pipework placed in position.chiymanJan 18, 2011
DSCF4957.JPG
Ground slab formwork completed and ready for the pour. Concrete mixer, sand, stone and cement ready.chiymanJan 18, 2011
DSCF4956.JPG
Ground slab formwork completed and ready for the pourchiymanJan 18, 2011
DSCF4965.JPG
Groundfloor formwork completed. Our construction workers lived in the tent which can been seen in the picture. They considered this to be more "professional" than constructing their own temporary accommodation!!chiymanJan 18, 2011
DSCF4964.JPG
Ground floor formwork completedchiymanJan 18, 2011
DSCF4963.JPG
Ground floor formwork completedchiymanJan 18, 2011
DSCF4962.JPG
Ground floor slab formwork completed and ready for concrete pour the next day. The bathroom (with the blue pipe sticking out) will be formed at a lower level and cast seperatelychiymanJan 18, 2011
DSCF4961.JPG
The waste from the downstairs toilet will be collected in this tank formed from precast concrete rings - this one is 4 rings deep.chiymanJan 18, 2011
DSCF4972.JPG
Ground floor slab completed - the part nearest the concrete mixer will be brushed once it has semi cured.chiymanJan 18, 2011