Platforms for construction of the roof which was very high - about 5m for eaves to top ridge. I wanted to have the roof as the mail recognisable feature of the house and was prepared to pay the additional cost for this.chiymanJan 18, 2011
|
|

Seems like a lot of steel in that roof. Shame they didnt follow my original design - would have saved about 25% of the steel required - what can one do when you are not there to supervise directly?chiymanJan 18, 2011
|
|

Another view or roof construction progresschiymanJan 18, 2011
|
|

The roof construction wee under way - required a lot of Yuca poles as scaffoldingchiymanJan 18, 2011
|
|

Supporting yuca poles for the roof constructionchiymanJan 18, 2011
|
|

Finishing the first floor slab concretechiymanJan 18, 2011
|
|

Finishing the concrete pour of the First Floor slab. All concrete was lifted by the bucket load to the first floor using the pully. At about 10kg a load the number of movements was considerable!!chiymanJan 18, 2011
|
|

Good quality hardwood doorframe squared and supported before blockwork constructionchiymanJan 18, 2011
|
|

First Floor Columns completed with Formwork removedchiymanJan 18, 2011
|
|

Formwork for window lintel being constructedchiymanJan 18, 2011
|
|

Columns constructed and window lintel for full height windows in place. The formwork will be removed once the concrete has curedchiymanJan 18, 2011
|
|