Last additions - Main Structure |
The form for the ground beam. The ground beam is dug out and formed using concrete blocks. The blocks will be left in the floor. dozerSep 28, 2011
|
|
Attaching the grc synthetic corrugated roofing board to the roof structure. Brand of roofing was Elephant, thickness 5 mm. Notice the parallel metal c sections used to form the gutter in the roof valley. dozerSep 28, 2011
|
|
The 3" hard wood is hammered into place to create a surface for the fascia board to be attached. dozerSep 28, 2011
|
|
More work on the roof. The cross members are set in place. The helper in blue is holding the ground while the foreman welds. dozerSep 28, 2011
|
|
The roof apex is 1.5 m above the prefabricated columns. Here the foreman is setting the roof apex in place. dozerSep 28, 2011
|
|
Here the foreman is doing the roof structure. The apex of the column is 4 meters (as can be seen imprinted on the top of the column) and is underground about 1 meter leaving about 3 meters. The stick is being used temporarily level the upper room beam. dozerSep 28, 2011
|
|
Fill Brought InShows the level of the dirt raised after fill is brought in via a tractor. The tractor was 500 per hour. dozerSep 28, 2011
|
|
Fill Dirt after PostsThis build used 4 meter tall prefabricated columns. They were set in footings and allowed to dry for 1 week, then fill dirt was brought in to raise the floor level. dozerSep 28, 2011
|
|
Small worker checks out the progress. dozerSep 28, 2011
|
|
Interior wall with electric sunken electric junction box. One row above the box there is a poured ring beam to add strength. dozerSep 28, 2011
|
|
|
|
|
|
|
|