happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Chok Dee #2 > Finishing

Last additions - Finishing
IMG_9750.jpg
Patio Getting ThereA view of the site at this late stage. Chaos started to subside.dozerSep 27, 2011
IMG_9768.jpg
Grouting the Upper Edge of the Wall TilesApplying grout to the often overlooked upper edge of the wall tiles. If not grouted these will collect moisture in the open pockets and over time the tiles will become loose. dozerSep 27, 2011
IMG_9770.jpg
Shower Enclosure Upper EdgeThe upper edge of the shower enclosure, grout being applied.dozerSep 27, 2011
IMG_9643.jpg
Kitchen Tiles DiamondThe kitchen, patio and bathroom tiles are laid in angled by 45 degrees within an outer border.dozerSep 27, 2011
IMG_9653.jpg
Finished and Grouted Bedroom TilesdozerSep 27, 2011
IMG_9659.jpg
Granito TilesThe granito tiles used in the front room and thicker and heavier than normal ceramic tiles. dozerSep 27, 2011
IMG_9665.jpg
Front Room being TileddozerSep 27, 2011
IMG_9724.jpg
Removal of Plastic SheetingThis stuff is great, look, no spots!dozerSep 27, 2011
IMG_9726.jpg
Colored Render Applied to Patio EdgesA colored render is being applied to the patio edges. This will look at lot better than paint and matches nicely with the coloration of the tiles.dozerSep 27, 2011
IMG_9729.jpg
Grouting the PatioA premium grout (mold resistant) was used throughout the house.dozerSep 27, 2011
IMG_9733.jpg
Aluminum DoorThe heavy duty aluminum door being fitted into place. This is a swing type door. dozerSep 27, 2011
IMG_9746.jpg
Door Glass InstallationThe door glass is locked in place. dozerSep 27, 2011
48 files on 4 page(s) 1

Debug Info 
Debug Output: show / hide