|
Last additions - Finished Project |
StudyThe study area utilizes walls that are 20 cm think so there is no column footprint visible. dozerSep 27, 2011
|
|
KitchenThe ceilings in the kitchen and great room area are stepped. There counter is granite and there is a side table for dining or sitting. The refrigerator will eventually go to the right of the sink (where the brooms are). dozerSep 27, 2011
|
|
Kitchen/Living AreaComing into the house there is a great room area which is an entry area, kitchen and study. dozerSep 27, 2011
|
|
Entry RoomThe entry room. Most of the house was tiled with super glossy granito tiles as in this room.dozerSep 27, 2011
|
|
Entry PatioThe patio entry area. The same granite type bezen tiles used on the drive way. White aluminum doors and windows with 1.5mm aluminum. dozerSep 27, 2011
|
|
WalkwayThere is a 1 m wide walkway along the front to the patio which goes all the way around the house. There is a step up to the patio of about 30 cm. dozerSep 27, 2011
|
|
Columns and Utility UnitsThe second utility/storage unit has a split roll up door. Each unit is about 4m wide x 6 m long. There are overall 30 columns throughout the project.dozerSep 27, 2011
|
|
Drive Way and Roll Up DoorThe parking lot along with a 2m side covered area. There are two storage/utility rooms with roll up doors. The ceiling is done using Chang brand 'smart board' which is vented to allow air flow in the attic.dozerSep 27, 2011
|
|
|
|
|
|