happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2 > Feature Wall

Last additions - Feature Wall
IMG_2752.jpg
Weber Tile AdhesiveThe weber tile adhesive is applied to prep the surface for the engraving.dozerSep 27, 2011
IMG_2748.jpg
Lower Section TiledPreparing for placing the mural, the lower section has been tiled and next the sandstone engraving will be lifted into place.dozerSep 27, 2011
IMG_2743.jpg
Engraving FrameThe prepared frame for where the 75 kg. engraving will be placed.dozerSep 27, 2011
IMG_2741.jpg
Preparing Engraving FrameThe wall was indented in order to have a frame to support the large sandstone engraving. dozerSep 27, 2011
IMG_2740.jpg
Large Melann Sandstone EngravingThese come in either 1 pc (as this one) or 3 pcs. We chose the single piece which weighs 75kg. dozerSep 27, 2011
IMG_2720.jpg
Decorative Standstone CarvingsThe small decorative sandstone 30 cm tiles (each under 200 baht) were placed in various locations on the wall. dozerSep 27, 2011
IMG_2718.jpg
Affixing Sandtone TilesThe sandstone tiles are fitted up near the wood trim. dozerSep 27, 2011
IMG_2715.jpg
Rendered SurfaceThe rendered surface with a pencil line where the sandstone engraving will be placed. The surface was rendered by the tiler to ensure true surfaces.dozerSep 27, 2011
20 files on 2 page(s) 2

Debug Info 
Debug Output: show / hide