Installing Shelving UnitThe shelving units are installed with anchor bolts to the inside of the concrete structure. dozerSep 27, 2011
|
|

Mounting the Upper CabinetsStarting to Mount the Upper CabinetsdozerSep 27, 2011
|
|

Hardware to Support Upper CabinetsThe wall mounting to support the upper cabinets. The electric is for above and below florescent lighting.dozerSep 27, 2011
|
|

Shelving UnitThis opening is designed for another shelving unit (Kitchzo). dozerSep 27, 2011
|
|

Tiling CompleteThe tiling and grouting of the cabinets are complete. dozerSep 27, 2011
|
|

Tiling on the InsideTiling on the inside of the cabinets.dozerSep 27, 2011
|
|

Tiled Table LegThe tiled and edged table leg prior to it being grouted.dozerSep 27, 2011
|
|

Tiled InsertThis opening is designed to accomodate a Kitzcho brand shelving insert. dozerSep 27, 2011
|
|

Tiling the Cabinet InteriorIn this case we used small white 4" tiles for the exterior and interior of the cabinets.dozerSep 27, 2011
|
|

Dryed StructureThe dried structure after the forms have been removed. dozerSep 27, 2011
|
|

Edged CornersThe corners of the cabinet and table top are edged and squared. dozerSep 27, 2011
|
|

Opening for Stove TopAn opening for the stovetop within the poured counter. dozerSep 27, 2011
|
|
|

|
|
|