Wood in RaftersHard wood is fitted in the end of the rafters to be used as a surface to install the fascia board. dozerSep 26, 2011
|
|
Gable VentThe gable vent is installed. dozerSep 26, 2011
|
|
Cutting the RaftersA guide line is used to ensure the rafters are cut at the proper point. dozerSep 26, 2011
|
|
Post to be Topped OffThis short post will be topped off with lanko 701 grout so the metal roof structure is sitting on concrete.dozerSep 26, 2011
|
|
CPAC Roof Tile EngineerThe tiling engineer from the company to do the roof tiling measuring and checking the roof structure so far. As they only lay down the tiles they must check that the roof structure is straight and able to hold the tile load. dozerSep 26, 2011
|
|
Attic WalkwayThis allows for easier access to the attic area. Created from two parallel steel tubing beams with C section rib supports and 20mm grade A plywood as the walkway. dozerSep 26, 2011
|
|
WalkwayTouching up paint and creating the attic walkway. dozerSep 26, 2011
|
|
Corner WeldA corner section sitting on a column. They do eventually touch up paint all of the welds in the structure.dozerSep 26, 2011
|
|
Starting the RoofStarting to put up the roof structure. dozerSep 26, 2011
|
|
Dipping BeamsThis isn't the best way to paint the steel tubing, it uses too much paint (as it turns out) and unless the metal is extremely clean (as in wiped clean with thinner) the coverage is spotty. dozerSep 26, 2011
|
|
Paint TrackA paint tray used to be able to dip the structural steel tubing into the primer paint.dozerSep 26, 2011
|
|
|
|
|
|
|