Home > House Construction > Cool Thai House Phase 2 > Structure

Last additions - Structure
IMG_1470.jpg
Spacers Wired into PlaceSpacers work well for beams and columns to make sure that there is required clearance where the concrete will go and that the frame is not sitting on the ground or touching the formwork. dozerSep 26, 2011
IMG_1457.jpg
Rebar Vertical SupportsWiring the vertical 6mm rebar into place each 20 cm. dozerSep 26, 2011
IMG_1449.jpg
Corner FrameworkCorner section showing beam rebar intersection with the column. dozerSep 26, 2011
IMG_1447.jpg
Concrete Delivery ChuteThis delivery chute was hand crafted from a split piece of 12 inch PVC pipe. dozerSep 26, 2011
IMG_1443.jpg
Bathroom LoweredThe beam for the bathroom was lowered by 5 cm corresponding with the step down. dozerSep 26, 2011
IMG_1430.jpg
Beam and Column IntersectionThe beam and column are contiguous rebar that will be concreted in place. dozerSep 26, 2011
IMG_1428.jpg
Ground BeamThe rebar framework for the ground beam. The beams were 40 cm by 20 cm wide. The beams will sit on top of the existing soil level and the floor will sit on top of the beams. dozerSep 26, 2011
IMG_1420.jpg
Support ColumnThe part of the column above the footing and below the ground.dozerSep 26, 2011
IMG_1419.jpg
Poured Support ColumnA poured support column (the part of the column under the floor). The guide lines are visible which indicate where the middle of each column should be. dozerSep 26, 2011
IMG_1418.jpg
Column FormworkThe formwork for the support column on top of the footing is done using cinder blocks which will stay in place after the pour. dozerSep 26, 2011
IMG_1335.jpg
Column Framework set in PlaceThe column frameworks are held upright by using pieces of 1 x 3" timber. dozerSep 26, 2011
IMG_1333.jpg
FootingFinishing off the top of one particular footing, height of 35 cm. dozerSep 26, 2011
69 files on 6 page(s) 5