DSC02451.JPG
The external bathroom footing with the rebar footing pad in place. dozer
DSC02458.JPG
The footing for the bathroom. The ground beam will be on top of this.dozer
20060911038.jpg
Interior wall with electric sunken electric junction box. One row above the box there is a poured ring beam to add strength. dozer
20060911042.jpg
Small worker checks out the progress. dozer
DSC02582.JPG
The exterior prior to rendering the surface. dozer
IMG_1770.JPG
dozer
IMG_1771.JPG
Approximate wall thickness after rendering, about 8 cm. dozer
DSC02599.JPG
After the exterior walls have been rendered. dozer
DSC02675.JPG
The interior after the pour of the floor and walls rendered. The floor was poured 8 - 10 cm and broomed rough in preparation for floor tiles. dozer
IMG_2834.JPG
Side view of the house, still partially finished. The bathroom is in the rear (with two glass blocks). dozer
   