Wall Tiles AppliedThe lower row of tiles is supported by concrete nails. This level is where the floor tiles will be after they are laid. Spacers are used to ensure consistent spacing. The surface is roughed prior to laying the tiles.dozer
|
|
Joint RepairThe joints are puttied to make so the wood looks as if it were one piece. The joints are miter cut to fit together at a 45 degree angle.dozer
|
|
PuttyThe fill putty is colored using the urethane as applied to the original wood trim to achieve a matching color. dozer
|
|
Column SquaringThe rough columns will be squared. Here a fishing line is run vertically down to a concrete nail in the floor which indicates the target line for the corner of the column, the lines indicate the external edges. dozer
|
|
Tile CuttersTile cutters make a smoother cut than a grinder but are often not used in other projects.dozer
|
|
Counter TilesThe kitchen cabinet tiles are off white tiles spaced at 3 mm intervals. dozer
|
|
White Aluminum Window FramesThe windows opening are measured and the frames are then installed to fit. This is the more expensive 1.2 mm thick white aluminum. Note that most installations do not use the frame piece, which adds to the durability + is a decorative addition.dozer
|
|
Special Grout for Glass BlocksA special grout that is designed specifically for glass blocks is used in the trim areas around the blocks. dozer
|
|
Nearly Finished Counter CabinetsThe counter nearly finished. dozer
|
|
Ceiling in KitchenThe ceiling in the kitchen after the installation of the trim wood.dozer
|
|
Gate Being WeldedThe gate being welded. dozer
|
|
Level LineA long clear plastic tubing is used to create a level line which will be used to set the top level for the floor tiles. The tube is filled with water, on one end a line is marked at the water line. At a different area perhaps several meters away another mark is made (in is a two man process). This two independent marks will be at the same level and measurement can be made from this point downwards to determine the target level for the tiles. dozer
|
|
48 files on 4 page(s) |
|