happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Chok Dee #2 > Finishing

IMG_9293.jpg
Patio PourShows the pour of the patio area. The columns are protected during the pour as cement and other discolorants are hard to clean off the stone facing. dozer
IMG_9301.jpg
Brick Column being FilledThe brick column being filled with concrete. The top ring beam of the perimeter wall has been formed using form wood and is ready to be poured.dozer
IMG_9315.jpg
Stone Trim being AppliedThe stone trim being cemented into place. The stone tiles are offset for effect. dozer
IMG_9317.jpg
Painting the Patio CeilingThe patio ceiling is made of the water resistant drywall plasterboard. Here a primer coat is being applied. dozer
IMG_9324.jpg
Bathroom Sink CounterPreparation for the pour of the bathroom sink. The same method is used as in the kitchen counter, the rebar used in the 6 mm thickness. The concrete will not be poured in the circular area where the sink will go and an open area will be left for the faucet. dozer
IMG_9326.jpg
Counter after PourThe bathroom counter after the pour. The faucet will set off to the right side of the sink where the PVC pipe is. dozer
IMG_9385.jpg
Kitchen PaintingThe kitchen being painted. The paint used was super shield (both primer and the finish coat). The kitchen and bathroom are semi gloss (washable) while the rest of the house are done in matte. dozer
IMG_9397.jpg
Counter Prep for GraniteThe counter is being prepped for laying in the granite slabs. dozer
IMG_9402.jpg
Slab put in PlaceHere the granite slab is set into place. The holes and edges are cut at the stone factory. The sinks were used by the factory to guarantee a perfect opening for the under mount sinks. The faucet holes will be drilled on site.dozer
IMG_9412.jpg
Faucet HolesThe faucet holes are drilled on site by the granite people. A special bit is used and water is poured during the during the drilling process to avoid having the granite surface crack. dozer
IMG_9425.jpg
Painting Door TrimThe door frame being painted. The sides are properly masked prior to painting. dozer
IMG_9440.jpg
Wood Trim being AppliedWood trim being applied to the corner section of the tiered ceiling. Glue is applied to the underside of the trim prior to nailing in place via an air gun. dozer
48 files on 4 page(s) 2

Debug Info 
Debug Output: show / hide